the installation PROCESS

Starting near the Dartmouth shore the bridge deck panels (in either 20 or 10 metre lengths) will be replaced overnight. A lifting gantry will be positioned on the suspender ropes, and the existing panel will be lowered to a barge in the harbour. View the Step by Step Process >