Updates/Closure Times

For information on the status of the project, or to see what’s been going on, click here.

Closures to the Macdonald Bridge
Fri July 21 Opening at 530 am/Closing at 7 pm – SW/BL open
Sat July 22 Closed to install expansion joint – SW/BL open
Sun July 23 Closed to install expansion joint – SW/BL open
Mon July 24 Opening at 530 am/Closing at 7 pm SW/BL closed 10pm to 5am
Tue July 25 Opening at 530 am/Closing at 7 pm SW/BL closed 10pm to 5am
Wed July 26 Opening at 530 am/Closing at 7 pm SW/BL closed 10pm to 5am
Thu July 27 Opening at 530 am/Closing at 7 pm SW/BL closed 10pm to 5am
Fri July 28 Opening at 530 am/Closing at 7 pm SW/BL closed 10pm to 5am
Sat July 29 Closed to install expansion joint
Sun July 30 Closed to install expansion joint
Mon July 31 Opening at 530 am/Closing at 7 pm
Tues Aug 1 Opening at 530 am/Closing at 7 pm
Wed Aug 2 Opening at 530 am/Closing at 7 pm

Note: the pedestrian/cycle lanes is now open. The shuttle service does not operate when the sidewalk and bike lane are open.

If you need information about Halifax Transit options/changes during the Big Lift you can find it here.

To find out if bridge closures are cancelled please check Twitter @hhbridges, call 902.406.5438 or download the app.